Pool Era field notes · Finishes and renovation
The First 28 Days After New Pool Plaster
Just had your pool built or replastered? The next four weeks matter. The finish is still curing under the water, and small mistakes now can show for years.
Here is what the industry's start-up steps ask for, in plain words.
Fill day
Fill it all at once.
- Wrap a clean cloth on the hose end and lay it in the deepest spot, so the water does not mark the surface.
- Fill to the middle of the skimmer without stopping, as fast as you can, with clean drinking water. NPC says this helps prevent a bowl ring and shrinkage cracks.
- Keep people and pets out of the pool while it fills.
- Start the filter system as soon as the water reaches the skimmer.[1]
Week one
Brush, test and wait.
- Brush the whole surface at least twice a day to lift plaster dust.
- Run the pump and filter nonstop for seven days, or until the dust is gone and the water is clear, and at least 72 hours.
- Test pH, total alkalinity and calcium hardness every day and adjust them in the order the NPC card lists.
- No chlorine for the first 48 hours. Do not turn on the heater until the plaster dust is gone.
- No wheeled vacuums or wheeled pool cleaners for 28 days. Brush vacuums are fine.[1]
Weeks two to four
Keep the water balanced.
- Keep pH and alkalinity in range every day.
- Raise calcium hardness slowly, to at least 200 ppm, if it is low.
- Add stabilizer (cyanuric acid) slowly through the skimmer, starting around day four, and brush after each dose.
- Salt pool? NPC says do not add salt for the first 30 days.
- After the dust is gone, brush when you see dirt or when you add chemicals.[1]
NPC does not recommend swimming until the water is properly balanced and sanitized.[1] Ask your builder when swimming can start in your pool.
Hill Country water
Hard fill water changes the plan.
NPC says very high or very low calcium hardness, pH or alkalinity in the fill water may mean the start-up steps need to change.[1] The San Antonio Water System says its typical hardness is 15 to 20 grains per gallon.[3] Test your fill water on day one, before you add anything.
Ask your builder or plasterer who handles start-up, and get the steps in writing.
Related
More field notes
Sources
Where these facts come from
- National Plasterers Council: Pool Start-Up Procedures card (2023)
- National Pool Tile: Swimming pool start-up procedures
- San Antonio Water System: Water quality FAQs (hardness)
Sources checked October 25, 2026. Rules, fees and water stages change; check the source before you rely on a number.
Before you rely on this. This field note is general information, not professional, engineering or legal advice. Every pool and every site is different. What Pool Era does on your project, how and with what warranty, is only what your written agreement says. Local codes and HOA rules change, so check with your city, county or HOA before you rely on anything here. Website terms


